How Long to Install Kitchen Cabinets: Expert Guide


Affiliate disclosure:As an Amazon Associate, I earn a commission from qualifying purchases made through the links in this article. This comes at no extra cost to you.

You’ve finally chosen your dream kitchen cabinets, but now you’re staring at an empty room wondering: how long to install kitchen cabinets? Most homeowners are shocked when their contractor says the job will take 3-5 days instead of the single weekend they envisioned. This timeline confusion causes 68% of kitchen remodels to run over budget—not because of materials, but because homeowners underestimate installation complexity. Whether you’re tackling a DIY project or hiring professionals, understanding the actual time requirements prevents costly scheduling mistakes. In this guide, you’ll discover exactly what affects cabinet installation duration, get phase-by-phase time breakdowns, and learn how to avoid the top 3 delays that add days to your project. Stop guessing and start planning with realistic expectations.

Professional Installation vs. DIY Time Realities

Hiring cabinet specialists typically cuts installation time by 40-60% compared to DIY attempts. Professionals complete standard 10×10 kitchens in 1-2 days because they arrive with pre-measured templates, specialized tools like laser levels, and crews trained to work simultaneously on base and wall units. DIYers often spend 3-5 days on the same project due to common pitfalls like misaligned cabinets requiring removal and rehanging. Crucially, professionals account for hidden variables you won’t find in YouTube tutorials—like correcting 15-year-old wall irregularities that throw off alignment. If you attempt DIY, budget an extra day just for troubleshooting unexpected issues. Always factor in that your first cabinet row will take twice as long as subsequent ones while you refine your technique.

Why Your Kitchen Layout Dictates Installation Speed

U-shaped kitchens with multiple corners add 4-6 hours to installation versus galley layouts. Each 90-degree corner requires precise mitered cuts and shimming that eats significant time. Islands are the biggest time-sink—adding 1.5-2 days due to complex plumbing/electrical coordination. Measure your linear footage: installations under 20 linear feet (small galley kitchens) take pros 6-8 hours, while 30+ linear foot layouts (common in open-concept homes) require 14-18 hours across two days. Never trust “per cabinet” time estimates—corner cabinets take 3x longer than straight runs due to alignment challenges.

When Cabinet Type Changes Your Timeline

Stock cabinets install fastest (7-9 hours for 20 linear feet) because components are pre-drilled for standard hardware. Semi-custom units add 2-3 hours as installers adjust adjustable shelves and specialized hardware. Full custom cabinets? Double the time—14+ hours—as every hinge placement and reveal requires manual measurement. Material matters too: solid wood doors need extra care during handling to prevent dents, while thermofoil cabinets allow faster mounting but require temperature-controlled rooms to avoid warping during installation.

Critical Pre-Installation Steps That Prevent Delays

Skipping proper wall preparation adds 5+ hours to your project. Professionals spend 2-3 hours before hanging the first cabinet verifying wall flatness with a 6-foot level. If walls deviate more than 1/8 inch over 10 feet (common in older homes), they install furring strips—a step DIYers often overlook until cabinets won’t align. Always check for:
Electrical conflicts: Outlets hidden behind new cabinet positions
Plumbing obstructions: Sink drainpipes interfering with base cabinet toe kicks
Subfloor issues: Squeaks or dips requiring leveling compound

Professionals use laser levels to create reference lines across all walls before unboxing a single cabinet. This 45-minute step prevents the “measure twice, cut once” nightmare of constant re-measuring. For DIYers, rent a rotary laser level—it pays for itself in avoided errors.

Why Countertop Timing Creates Hidden Delays

Most homeowners don’t realize cabinet installation isn’t truly “done” until countertops are set. Contractors install cabinets to precise 1/16-inch tolerances specifically for countertop templating. If you rush to paint or install backsplash before countertops, you’ll face 8-12 hours of rework when templaters need access. Always schedule:
1. Cabinet installation (Day 1-2)
2. Countertop templating (Day 3 morning)
3. Countertop installation (Day 5-7)
4. Final cabinet adjustments (Day 7)

Skipping this sequence adds 3+ days when templaters find cabinets out of level.

Phase-by-Phase Installation Time Breakdown

kitchen cabinet installation timeline infographic

Base cabinets consume 60% of total installation time due to weight and precision requirements. Here’s the real timeline for a standard 25-linear-foot kitchen:

Day 1 Morning (3-4 hours)
– Install starter cabinets at corners using shims for perfect plumb
– Mount subsequent base units, checking level every 24 inches
– Secure to wall studs with 3-inch cabinet screws (not drywall anchors!)

Day 1 Afternoon (2-3 hours)
– Install wall cabinets starting from reference lines
– Mount upper units 18 inches above base cabinets (industry standard)
– Verify consistent reveals between doors before final tightening

Day 2 (4-5 hours)
– Install corner cabinets and specialty units (pantries, islands)
– Mount doors/drawers and adjust hinges
– Final level checks across all units

Never attempt hanging wall cabinets before base cabinets—this adds 2+ hours when you discover misalignment during countertop prep.

Troubleshooting Common Time-Wasters

kitchen cabinet alignment problems and solutions diagram

When cabinets won’t align, these fixes prevent multi-hour delays:

Issue Quick Fix Time Saved
Gaps between cabinets Insert 1/8″ cardboard spacers during alignment 45+ minutes
Doors not closing flush Loosen hinge screws, adjust reveal, re-tighten 20 minutes per door
Cabinet wobbling Drive extra screw into stud (not stud edge) 15 minutes per unit

The #1 time killer? Not using a cabinet jack. Rent one for $15/day—it holds wall cabinets perfectly while you secure them, eliminating the “third hand” problem that adds 2 hours to DIY installs.

How to Slash Your Installation Timeline by 30%

Professionals use three time-saving tactics you can replicate:

  1. Pre-assemble face frames
    Mount doors/drawers on the ground before hanging cabinets. This prevents balancing acts on ladders and cuts adjustment time by 50%.

  2. Mark stud locations visibly
    Use painter’s tape to label every stud location at 16″ intervals. Installers waste 20+ minutes per wall hunting for studs otherwise.

  3. Stage hardware by cabinet
    Bag screws/hinges for each cabinet unit. Searching for the right size mid-installation adds 1.5 hours to the job.

For DIYers, the biggest time-saver is renting a cabinet positioning tool. These $20 rentals hold units perfectly plumb while you secure them—eliminating the frustrating “hold with one hand while screwing with the other” struggle.

When to Expect Delays: The Unavoidable Time Traps

Three scenarios almost always add 1+ days to your project:

  • Out-of-plumb walls: Common in homes over 10 years old. Fixing requires shimming every 12 inches, adding 3-4 hours. Pro tip: Use tapered shims for smoother transitions.
  • Electrical conflicts: Discovering outlets behind new cabinet positions forces electricians back—adding 24-48 hours for scheduling. Always verify outlet locations with a stud finder before ordering cabinets.
  • Delivery errors: Wrong cabinet sizes or missing components cause 3-5 day waits for replacements. Always inspect delivery against your layout diagram before the truck leaves.

Weather impacts timelines too—installing cabinets in humidity above 60% causes wood expansion that throws off alignments. Schedule installations for dry, mild days when possible.

Realistic Timelines for Every Project Size

kitchen size vs cabinet installation time chart

Forget generic “per cabinet” estimates. Base your schedule on kitchen footprint:

  • Small kitchens (8×10 ft): 6-8 hours (1 day for pros, 2-3 for DIY)
  • Average kitchens (10×12 ft): 10-14 hours (1.5 days pros, 3-4 DIY)
  • Large kitchens (12×15+ ft with island): 16-22 hours (2-3 days pros, 5-6 DIY)

Custom projects add 50% more time. A high-end 35-linear-foot kitchen with glass inserts and roll-out trays takes pros 3 full days minimum. Always add a 10% time buffer—unexpected issues like discovering rotted subflooring under old cabinets can add half a day.

Post-Installation Steps That Complete the Timeline

Cabinet installation isn’t “done” when the last screw is tightened. Factor these critical finishing steps:

  • Countertop templating: Requires cabinets to sit 48 hours for final settling (adds 2 days)
  • Hardware adjustments: Doors shift slightly after initial hanging—allow 2 hours for final tweaks
  • Seam filling: Caulking gaps between cabinets and walls takes 1-2 hours but must dry before painting

Skipping the 48-hour settle period before templating causes 90% of countertop fit issues. Rushing this step means costly re-templating delays.


Final Note: Your cabinet installation timeline hinges on preparation more than hanging speed. By verifying wall conditions, staging tools properly, and respecting the countertop sequence, you’ll avoid the delays that turn 2-day jobs into week-long headaches. For accurate scheduling, get written time estimates from contractors that break down: pre-install checks, base cabinet mounting, wall cabinet hanging, and post-install adjustments. Remember—when contractors say “1 day,” they mean 8 billable hours of work, not calendar days. Always confirm whether their timeline includes countertop coordination. For next steps, download our free cabinet installation checklist that prevents the 7 most common timeline killers.